Portfolio
At Fort Infra, we pride ourselves on having a team of highly skilled professionals with extensive global experience in the construction industry. Our diverse backgrounds and expertise enable us to tackle projects of any size and complexity, ensuring the highest standards of quality and innovation.
Expertise Across Borders
With a combined experience of over 50 years, our team has successfully delivered projects in various regions. This international exposure equips us with unique insights into different building codes, regulations, and cultural considerations, allowing us to adapt our approach to meet the specific needs of each project.
Commitment to Excellence
Our experts are not only well-versed in the latest construction techniques and technologies but also committed to sustainable practices and safety standards. We believe in continuous learning and regularly participate in industry workshops and certifications to stay ahead of trends and innovations.
Collaborative Approach
We understand that successful construction projects are built on strong collaboration. Our team works closely with clients, architects, and subcontractors to ensure seamless communication and efficient project execution. By fostering a collaborative environment, we deliver results that exceed expectations.
Join Us on Our Journey
At Fort Infra, we are passionate about transforming visions into reality. Whether it's a residential development, commercial construction, or infrastructure project, our experienced team is dedicated to delivering excellence every step of the way.
Together, we build the future!!
"We prioritize safety at every step of our construction process, adhering to the highest industry standards to ensure the well-being of our team and the integrity of our projects."


PROMOTERS
Fort Infraventure Private Limited is another venture by the Punj family, renowned for founding the Punj Lloyd Group. The family has a legacy of establishing diversified conglomerates, primarily in the engineering, procurement, and construction (EPC) sector. Their companies have successfully executed projects across various industries, including energy, infrastructure, and defense.
Starting from humble beginnings, the Punj family's enterprises grew from pipeline construction into a globally diversified EPC group. The journey is filled with rich experiences gained from different regions, with stories of people who played key roles, the complexities of diverse projects, and the challenges they faced along the way.
All the Punj family’s companies started modestly, initially focusing on pipelines, but later expanding into building tanks, terminals, refineries, power plants, and civil infrastructure. They quickly recognized opportunities in international markets, securing overseas contracts by remaining resilient during global crises, while many competitors withdrew. Their footprint expanded across the Caspian region, the Middle East and North Africa, Southeast Asia, and South Asia.
Once again, we aim to build on this legacy, creating a strong EPC brand that brings together global operations and a diverse range of services. Our new logo symbolizes synergy, representing various entities coming together to form a whole greater than the sum of its parts.
Meet Our Esteemed Collaborators
Landmark Projects by Our Key Members
Civil Construction Projects by Our Key Members
S No | Project Name | Client | Description |
---|---|---|---|
1 | Infrastructure of Zliten, Libya | Housing and Infrastructure Board (MIB) | Designing and construction of the storm water network, water network, telecommunication, power, natural gas, street lighting and road networking including traffic management system and other facilities. |
2 | Asian Highway | Ministry of Road Transport & Highways | Rehabilitation and upgradation of two and four laning of Bhutan border at Pasakha to Bangladesh border at Changrabandha comprising Jaigaon, Hasimara, Dhupguri section and Mainaguri-Changrabandha section. This contract includes the proposed Pasakha access road of 6.558 km, bypass to Jaigaon and Hasimara in the state of West Bengal, India |
3 | Upgradation of Gorakhpur -Gopalganj section of NH-28, Bihar, India | National Highways Authority of India | Four laning from 360.915 km to 402.000 km of the Gorakhpur- Gopalganj section of NH-28 in Bihar. |
4 | Infrastructure of Souk Al Juma, Tripoli, Libya | Housing and Infrastructure Board (HIB) | Engineering, procurement and construction of infrastructure work including sewerage, storm water main and branch lines, roads and other facilities. |
5 | Sikkim Greenfield Airport | Airports Authority of India | Construction of a high altitude greenfield airport in the foothills of the Himalayas on 1,410 m involving cutting and filling earthwork, geogrid reinforced retaining wall with maximum height 80.38 m, drainage system including box culvert, cascading drains, underground tunnels and aerodrome pavements at Pakyong. |
6 | Nagpur Capitol Heights | TRIF Real Estate and Development Pvt Ltd | Civil, excavation and other auxiliary work of the integrated residential and retail complex across 10 acres in Nagpur City, Maharashtra and includes four residential towers - two 23 storeyed and two 20 storeyed, along with a retail complex. |
7 | Infrastructure of Arada Zone, Tripoli, Libya | Housing and Infrastructure Board (HIB) | Engineering, procurement and construction of infrastructure work including gravity sewers, storm sewers, rising mains, roads and other facilities. |
8 | Railway Siding, Uttar Pradesh | Uttar Pradesh Vidyut Utpadan Nigam Ltd | Earthwork, ground improvement, construction of bridges, workshop building, electrical and other miscellaneous activities. |
9 | Medical College and Hostel Complex | Ministry of Health and Family Welfare | Construction of medical, dental and nursing colleges, six hostel buildings, warden residence, auditorium, civil work, fire fighting and electrical work at AIIMS, Raipur. |
10 | Upgradation of Guwahati-Nalbari section of NH-31, East West Corridor, Assam (AS-4) | National Highways Authority of India | Four laning and strengthening of 28 km of NH-31 with flexible pavement including construction of ten minor bridges and 39 culverts. |
11 | Upgradation of Guwahati-Nalbari section of NH-31, East West Corridor, Assam (AS-5) | National Highways Authority of India | Four laning and strengthening of 28 km of NH-31 with flexible pavement including construction of eight major bridges, 13 minor bridges and 23 culverts |
12 | Bangalore Metro � Reach 2 | Bangalore Metro Rail Corp Ltd | Construction of three elevated Metro Stations viz. Mysore Road Terminal, Deepanjali Nagar and Magadi Road Stations in Reach-2. |
13 | ASF Insignia IT (SEZ project) Gurgaon, India | Canton Buildwell Pvt Ltd | Civil, structural work and external development for construction of building including three level basement and 17 storeys with built-up area of about 1.15 million sq.ft. |
14 | Upgradation of Silchar to Balachera section of NH-54, Assam (AS-1) | National Highways Authority of India | Four laning of Silchar to Balachera section from km 306.54 to km 275 of NH-54, construction of flexible pavement, widening of existing two lanes to four lanes, construction of road over bridge, major bridges, minor bridges and culverts, etc. |
15 | Upgradation of Lanka to Daboka section of NH 54, Assam (AS-16) | National Highways Authority of India | Four laning and strengthening of 23.8 km (including 4.2 km of Daboka bypass) of NH-54 with rigid/flexible pavement including construction of one major, eight minor bridges and 46 culverts. |
16 | Upgradation of NH- 31 Khagaria to Purnea, Bihar, India | National Highways Authority of India | Upgradation of two lanes, undivided carriageway with paved shoulders. Work entails design build finance, operate and transfer of the 140 km section of the National Highway. |
17 | Upgradation of Nalbari to Bijni section of NH-31 on East West Corridor, Assam (AS-9) | National Highways Authority of India | Four laning and strengthening of 21.5 km of NH-31 with rigid/ flexible pavement including construction of two major bridges, eight minor bridges and ten culverts. |
18 | Upgradation of Nalbari to Bijni section of NH-31 on East West Corridor, Assam (AS-8) | National Highways Authority of India | Four laning and strengthening of 30 km of NH-31 with rigid/flexible pavement including construction of two major bridges, eight minor bridges and 22 culverts. |
19 | Hyderabad Vijayawada section of NH-9 | National Highways Authority of India | Four and six laning of Hyderabad-Vijayawada section from km 40 to km 221.5 of NH-9 on BOT (Toll) basis under NHDP Phase-III in the State of Andhra Pradesh. |
20 | Institute Complex, Rai Bareli | Rajiv Gandhi Institute of Petroleum Technology | The scope of work entails civil, structural and associated work including site development, construction of 27 buildings consisting of administration and library building, auditorium, community centre, lecture halls, commercial centre, staff housing facility, hostels and health care centre over an area of 16 lac sq ft at Rajiv Gandhi Institute of Petroleum Technology in Rai Bareli, UP. |
21 | Infrastructure of Arada Zone, Tripoli | Housing and Infrastructure Board (HIB), Tripoli, Libya | Engineering, procurement and construction of infrastructure work including gravity sewers, storm sewers, rising mains, roads and other facilities for Arada Zone, Tripoli, Libya. |
22 | Infrastructure of Souk Al Juma, Tripoli | Housing and Infrastructure Board (HIB), Tripoli, Libya | Engineering, procurement and construction of infrastructure work including sewerage, storm water main and branch lines, roads and other facilities for Souk Al Juma, Tripoli, Libya. |
23 | Bangalore Metro � Reach 1 | Bangalore Metro Rail Corp Ltd | Construction of two elevated Metro stations at MG Road and Trinity Circle Terminals in Reach-1. |
24 | Parking Facility for Commonwealth Games 2010 | Municipal Corporation of Delhi | Covering of two storm water drains totalling 1,979 m in length, on Lodhi Road, Delhi. |
25 | Upgradation of Lalsot to Kota Road in Rajasthan (LJ-1) | RIDCOR | Widening and strengthening of 189.95 km existing carriageway to two-lane highway including 2 m wide paved, 1.5 m wide soft shoulders on either side construction of bypass, construction of railway-over bridges, minor/major bridges, user free plazas and associated facilities, construction of bus-bays, passenger shelters and truck lay-byes, high speed weigh-in-motion system, landscaping and arboriculture. |
26 | Construction of Elevated Viaduct with stations | Delhi Metro Rail Corp Ltd | Part design and construction of Elevated Viaduct of length 4.784 km, structural work of four elevated stations-Nangloi, Nangloi Rly Station, Rajdhani Park and Mundka on Inderlok-Mundka Corridor of Phase II of Delhi Metro. |
27 | Upgradation of NH-76, Rajasthan (RJ-8) | National Highways Authority of India | Four laning and strengthening of 65 km of NH-76 with rigid/flexible pavement including construction of 12 minor bridges, 13 under passes and 82 culverts. |
28 | Medicity Phase-1 | Global Health Pvt Ltd | Civil and structural work of multi-speciality medical institute - Medicity. Construction of built up floor area of 20,000 m2 comprising a 21 storeyed OPD block, two 18 storeyed IPD Blocks, nine storied OT block and seven storeyed admin and night lounge blocks at Sector 38, Gurgaon. |
29 | Upgradation of Ratangarh to Kishangarh Road in Rajasthan (HK-2) | RIDCOR | Widening and strengthening of 206.5 km existing carriageway to two lane highway including 2 m wide paved, 1.5 m wide soft shoulders on either side construction of bypass, railway-over bridges, minor/major bridges, user free plazas and associated facilites, bus-bays, passenger shelters and truck lay-byes, high speed weigh-in-motion system, landscaping and arboriculture. |
30 | Upgradation of Hanumangarh to Ratangarh Road in Rajasthan (HK-1) | RIDCOR | Widening and strengthening of 200 km existing carriageway to twolane highway including 2 m wide paved, 1.5 m wide soft shoulders on either side construction of bypass, railway-over bridges, minor/ major bridges, user free plazas and associated facilites, bus-bays, passenger shelters and truck lay-byes, high speed weigh-in-motion system, landscaping and arboriculture. |
31 | Upgradation of Baran to Jhalawar Road in Rajasthan (LJ-2) | RIDCOR | Widening and strengthening of 77.26 km existing carriageway to two-lane highway including 2 m wide paved, 1.5 m wide soft shoulders on either side construction of bypass, railway-over bridges, minor/major bridges, user free plazas and associated facilites, bus-bays, passenger shelters and truck lay-byes, high speed weigh-in-motion system, landscaping and arboriculture. |
32 | Upgradation of Mohania- Sasaram Section of NH-2, Bihar | L G Engineering and Construction Corp/Inter- Continental Consultant and Technocrats | Four laning and strengthening of NH-2 from Mohania to Sasaram, (45 km long) from two lane highway to four-lane. New concrete pavement including 11 RCC bridges, six pre-stressed bridges, 57 culverts and one syphon. |
33 | Construction of Jaipur Bypass Zone D, Rajastha | National Highways Authority of India/ Meritec Ltd | Construction of access controlled four-lane divided carriageway with six lane structures, 34.7 km long, connecting NH-8 at Chandwaji and NH-11 at Harmara, including a 30.9 km service road, two flyovers, 11 underpasses, 39 culverts and arboriculture. |
34 | Upgradation of Gowthami- Diwancheru Section of NH-5, Andhra Pradesh | National Highways Authority of India/ SNC Lavalin Inc. | Widening and strengthening of existing two lane carriageway to four lanes from Gowthami bridge to Diwancheru section (chainage 164.50 km to 200 km), including construction of one bridge, 71 culverts and arboriculture. |
35 | Elevated Viaduct from Barakhamba Road Connaught Place for Line No. 3 | Delhi Metro Rail Corp Ltd | Construction of elevated structures - viaducts and ramp (chainage 8.00 km to 14.30 km) from Kirti Nagar to Tilak Nagar section for Line No. 3, including construction of piles, substructure, pre-stressed segmental construction of superstructure and overhead electric line masts at Delhi. |
36 | Upgradation of Dharmavaram- Tuni Section of NH-5, Andhra Pradesh | National Highways Authority of India/ Zaidum Leeng, Malaysia and Artefact Project India (Joint Venture) | Design engineering and construction for strengthening and widening of NH-5 from Dharmavaram to Tuni (chainage 253 km to 300 km) from the existing two lanes to four lanes, widening of the existing structure to six lanes, including the construction of the 6.72 km new alignment, 9 km service road, five grade separators, 11 bridges, one road overbridge, eight underpasses and 149 culverts. |
37 | Upgradation of Rajahmundry- Dharmavaram Section of NH-5, Andhra Pradesh | National Highways Authority of India/ Zaidum Leeng, Malaysia and Artefact Project India (Joint Venture) | Design engineering and construction for strengthening and widening of NH-5 from Rajahmundry to Dharmavaram (chainage 200 km to 253 km) from two lanes to four lanes and widening of existing structures to accommodate six lanes, including the construction of the 7.97 km new alignment, service road, four bridges, five underpasses, culverts, 12-lane toll plaza and one maintenance yard. |
38 | Upgradation of Belgaum- Maharashtra Border Section of NH-4, Karnataka | National Highways Authority of India/ Frischmann Prabhu (India) Pvt Ltd | Design engineering and construction for strengthening and widening of NH-4 from Belgaum to Maharashtra border (chainage 515 km to 592 km) from existing two lanes to four-/six lanes, including 5 km bypass and 142 km of service road, widening of structures to four/six lanes construction of seven grade separators, 22 bridges, one subway, 19 cattle walks/cart tracks, four underpasses and 124 culverts, six vehicular underpasses, arboriculture and illumination of highway. Excavation � Earthwork in filling � 4,000,000 m3 � Earthwork in cutting (soil) � 800,000 m3 � Earthwork in cutting (rock) � 850,000 m3 Concrete � Pre-stressed concrete � 5,000 m3 � DLC+PQC � pavement concrete � 40,000 m3 � Concrete in other structures � 200,000 m3 Steel � Reinforcing steel � 12,500 MT � Pre-stressing steel � 250 MT |
39 | Upgradation of Nasirabad- Gulabpura Section of NH-79, Rajasthan | National Highways Authority of India/ Sverdrup Civil Inc., New Delhi | Four laning and strengthening of NH-79 from Nasirabad to Gulabpura (chainage 15 km to 70 km) section, including the construction of a service road, one road overbridge, ten bridges, 60 pipe culverts and arboriculture. |
40 | Infrastructure and Services to Dukhan Support Services, Qatar | Voltage Engineering Ltd/ Qatar Petroleum | Engineering, procurement, construction, installation and commissioning of infrastructure and services, including testing, pre-commissioning and assistance in commissioning for fire water system, fire hydrant pumping station, foul sewerage system, potable water supply system, surface water drainage system, storage tank and road network |
41 | Earthwork construction, Area 10 and 11, Central Duri, Riau, Indonesia | PT Caltex Pacific Indonesia | Development of producer/injection well pad locations in Area-10 of Duri Steam flood area construction of pipe corridors and oilfield roads, compacted for movement of heavy equipment and drilling rigs. |
42 | Development of Bawana Industrial Park | Delhi State Industrial Dev. Corp Ltd (DSIDC)/ RITES | Construction of new industrial park for relocation of industries, including construction of internal roads, parking lots, water supply system, waste water system, storm water drainage and fire-fighting network in Delhi |
43 | Road Overbridge for Karur Bypass | National Highways Authority of India Ltd/RITES | Four lane 842 m long road overbridge in lieu of level crossing near Karur, on NH-7, including 32 T-beam slabs each 17.5 m long, four pre-stressed obligatory spans 25.10 m long, two pre-stressed rail spans 25.5 m and RCC retaining walls 784 m long. |
44 | Earthwork construction, Area 10, Duri, Riau, Indonesia | PT Caltex Pacific Indonesia | Development of producer/injection well pad locations in Area-10 of Duri steam flood area and construction of pipe corridors and oilfield roads, compacted for movement of heavy equipment and drilling rigs. |
45 | Earthwork construction, Area 10, Duri, Riau, Indonesia | PT. Caltex Pacific Indonesia | Development of producer/injection well pad locations in Area-10 of Duri steam flood area and construction of pipe corridors and oilfield roads, compacted for movement of heavy equipment and drilling rigs. |
46 | Noida- Greater Noida Expressway | IRCON International Ltd | Construction of expressway up to WMM level between Noida and Greater Noida-Phase I (km+000 to 3+500). |
47 | Bawana Water Treatment Plant | Municipal Corp of Delhi | Construction of 91 mld capacity water treatment plant at Bawana, involving: � Construction of 3 Nos. clear water reservoirs of 61 m x 61 m and 3.6 m ht � Clarifloculator: 4 Nos. dia 33.5 m � Filter house, chemical house, sludge sumps, pump house, administrative building, annexe building, filter house and associated road work |
48 | Emergency Water Reservoir | Dabhol Power Co/TCE Consulting Engineers Ltd | Engineering, procurement and construction of reservoir of 120,000 m3 capacity at Dabhol, Maharashtra |
49 | Tank Excavation and Construction of Alternate Road | Metropolis Gas Co. Pvt Ltd | Excavation for Tank T-100 and construction of alternate road at Dabhol, Maharashtra: � Earthwork � 49,000 m3 � Hard rock (by blasting) � 100,000 m3 |
50 | LNG Storage and Regasification Terminal | Skanska Cementation International Ltd/ Enron, USA | Earthwork (roads, tanks and drainage) � Excavation in soil: 530,000 m3 � Excavation in rock: 320,000 m3 � Filling: with soil: 290,500 m3 with rock: 316,500 m3 with select and graded material: 22,500 m3 Concrete Work � Pre-stressed concrete in tank outer wall base and ring beam: 27,000 m3 � Reinforced concrete in all structures except tanks: 19,855 m3 � Cryogenic concrete: 1,200 m3 � Rebar: 3,000 MT � Cryogenic rebar: 1,372 MT � Pre-stressed tendons: 1,800 MT � Grouting cement for pre-stressing work: 1,800 MT Structural Steel Fabrication 8,900 MT The above civil work were part of a project for the construction of 3 Nos. 160,000 m3 (79.2 m dia x 54 m ht), LNG tanks, pipework, insulation application, painting, electrical and instrumentation work, fire-fighting system, equipment erection, including unloading arms installation and commissioning assistance for LNG Storage and Regasification Terminal at Dabhol, Maharashtra. |
51 | Vadodara-Halol Tollway | Vadodara-Halol Toll Road Ltd | Construction of 32 km four-lane tollway from Vadodara to Halol, including toll operation and asset maintenance for a period of 30 years. |
52 | Peeragarhi Flyover | U P State Bridge Corp Ltd | Construction of 220 Nos. (1,200 mm dia) bored cast-in-situ piles (total length 3,750 rm) and pile capping work of 2,480 m3 in New Delhi. |
53 | Soda Ash Plant | Nirma Ltd | Construction of 4,341 Nos. driven cast-in-situ piles, civil work, including tunnels, silos, sumps water retaining, structural steel work, road and other development work at Kala Talav, Bhavnagar. |
54 | Raja Garden Flyover | U P State Bridge Corp Ltd | Installation of 11,000 rm (1,200 mm dia) bored piles and pile capping work (concrete 13,000 m3) for construction of grade separator at intersection of Ring road and Najafgarh Road, New Delhi |
55 | Raw Water System | Reliance Industries and Infrastructure Ltd | Installation of 11,000 rm (1,200 mm dia) bored piles and pile capping work (concrete 13,000 m3) for construction of grade separator at intersection of Ring road and Najafgarh Road, New Delhi. |
56 | Effluent Treatment Plant | Oil and Natural Gas Corp Ltd | Design, engineering, supply, erection and commissioning of 4,000 m3 per day effluent treatment plant at North Santhal. |
57 | Raw Water Intake System | Chambal Fertilisers and Chemicals Ltd | Design, procurement, erection and commissioning of raw water system comprising approach bridge, intake well, tunnel, pumping station and (24� dia) 7 km pipeline for Gadepan plant. |
58 | DM Water Plant | Chambal Fertilisers and Chemicals Ltd/ Toyo Engineering India Ltd | Civil work for DM Water Plant at Gadepan. |
59 | Sewerage and Storm Water System | DLF Builders and Developers Ltd | Development work, including overhead and underground tanks, sewerage system and storm water drains at Qutab Enclave, Gurgaon. |
60 | Jet Engine Test Bed and Repair Facility | Indian Airlines/ General Electric Technical Services Co Incs, USA | Design, procurement and erection of total facility on turnkey basis, covering civil and mechanical work, airconditioning system, electrification, instrumentation and acoustics at IGI Airport, New Delhi |
61 | Aero Engine Test Bed Facility | Commander Work Engineers (Projects), Kanpur | Complete modification, including design/engineering of test cell and ejectors for test bed facility, along with acoustic insulation at Kanpur. |
62 | Aero Engine Test Bed Facility | Hindustan Aeronautics Ltd | Fabrication, erection of steel structures and augmentors, including testing and commissioning of aero engine test bed facility at Koraput, Orissa. |
63 | Aviation Fuelling Complex | Bharat Petroleum Corp Ltd/Dalal Consultants | Mechanical erection of piping and equipment, along with associated civil work for Aviation Fuelling Complex at IGI Airport, New Delhi. |
64 | Foldable Acoustic Partition | Delhi Development Authority | Design, fabrication, erection and commissioning of 55 m foldable acoustic partition for indoor stadium. |